loader image
  • projects@radhecon.com
  • 0281 - 2332392
  • projects@radhecon.com

CORE EXPERTISE

5

Building reliable infrastructure across water, energy, transportation, and civil sectors with quality, safety, and engineering excellence.

Oil & Gas Infrastructure
5

Construction of cross-country pipelines, transmission networks, and industrial pipeline systems for oil, gas, and energy sectors.

Water Infrastructure
5

Execution of water transmission pipelines, distribution networks, ESRs, sumps, and large-scale water supply projects.

Renewable Energy Infrastructure
5

Comprehensive infrastructure solutions for wind energy projects, including foundations, civil works, and site development.

Lining & Guniting Solutions
5

Specialized canal lining, guniting, shotcrete application, and rehabilitation works for irrigation and water conservation projects.

Building Construction
5

Execution of water transmission pipelines, distribution networks, ESRs, sumps, and large-scale water supply projects.

Bridge Infrastructure
5

Execution of bridge, flyover, and structural infrastructure projects supporting transportation and connectivity networks.

OUR WORK

IRRIGATION INFRASTRUCTURE PROJECT

PATI Lift Micro Irrigation Project

Development of a large-scale micro irrigation system utilizing pressurized pipelines to provide reliable water distribution and improve irrigation efficiency across the PATI command area.

WATER PIPELINE INFRASTRUCTURE

MRPL Water Transmission Pipeline Project

Execution of critical water conveyance infrastructure involving high-capacity MS pipelines, valve systems, and supporting civil works to ensure reliable and efficient water distribution across the project region.

SAUNI Yojana Link-3 Package-7 Pipeline Project

Strategic Bulk Water Conveyance System Development

Execution of high-capacity water conveyance infrastructure featuring extensive pipeline installation, testing, commissioning, and supporting civil works to strengthen long-distance water supply networks.

SAUNI Yojana Link-4A Package-8 Pipeline Project

Regional Water Conveyance Network Expansion

Execution of critical water supply infrastructure featuring high-capacity MS pipelines and supporting civil works designed to ensure efficient and reliable water delivery to multiple regions.

SAUNI Yojana Phase-II Link-4 Package-4

Strategic Water Conveyance Infrastructure Development

Execution of high-capacity water transmission infrastructure featuring 3000 mm diameter pipelines, testing, commissioning, and supporting civil works for efficient regional water supply.

SAUNI Yojana Phase-II Link-3 Package-6

Machhu Reservoir Water Transmission Project

Construction of a high-capacity water transmission network connecting the Machhu Reservoir through feeder pipelines and pumping systems, strengthening long-distance water supply infrastructure in Gujarat.

SAUNI Yojana Link-3 Package-4

Strategic Water Pipeline Development Project

Execution of critical bulk water conveyance infrastructure featuring 3000 mm diameter MS pipelines and supporting civil works for reliable long-distance water supply across Gujarat.

PROJECT PORTFOLIO

Delivering Infrastructure Excellence Across
Ongoing & Completed Projects

Our project portfolio highlights both ongoing and completed works across multiple sectors, demonstrating our capability to execute complex infrastructure projects with precision, reliability, and a focus on client satisfaction.

Sr.Client’s NameDescription of the Work
1Narmada Valley
Development Authority
Government of Madhya
Pradesh
Construction of Piped Irrigation system to supply
water through pressurized pipeline system for
micro irrigation (Drip/Sprinkler) to deliver at farmers
field up-to 2.50 ha chak with a duty of 0.356
Lit/sec/Ha with at least 23 Meter Residual Head at
each 2.50 Ha chak with total power requirement of
5.22 MW in CCA of 5500 hectare, out of gross
command area 10500 hectare, fully covering the
entire compact and contiguous possible arable
area. Any area increase in CCA with in the GCA
shall be permitted with prior written approval of
Chief Engineer for Micro Irrigation system under
PATI LIFT MICRO IRRIGATION PROJECT
2Gujarat Water
Resources Development
Corporation (GWRDC)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Crop compensation, unloading, Excavation, laying,
jointing, testing, backfilling, disposal of surplus
earth & commissioning of MS Pipeline (ID) of
Various dia such as 1500 mm dia, 950 mm dia
& 800 mm dia of various thickness such as
11mm, 10.5mm,7mm & 6.5mm, (Total Lenght
41.09 KM) Erection of butterfly, scour & Air valves
of various dia and associated civil work including
supply of all consumable material for Madhavgadh
Taluka Talod to Raygadh Taluka Himmatnagar
Dist. Sabarkantha Pipeline Project.
3Narmada Water
Resources, Water
Supply and Kalpsar
Department
(NWRWS&KD - Gujarat)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Sauni Yojana Link - 3, Package - 7 : Crop
compensation, unloading, Excavation, laying,
jointing, testing, backfilling, disposal of surplus earth
& commissioning of MS Pipeline From Ch. 146.383
Km (UND - III) to 216.053 Km. with branches for Moj
and Sorathi (Total pipeline lenght 104.165 Km)
Erection of butterfly, scour & Air Valve of various
diameter and associated civil work including supply of
all consumable material @ Kalawad (Gujarat)
4Narmada Water
Resources, Water
Supply and Kalpsar
Department
(NWRWS&KD - Gujarat)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Sauni Yojana Link - 4A, Package - 8 : Crop
compensation, unloading, Excavation, laying,
jointing, testing, backfilling, disposal of surplus earth
& commissioning of MS Pipeline From Ch. 0.00 Km
to 43.980 Km. for branches of Munjiyasar and
Khodiyar Reservoir and from Ch. 0.00 Km to
41.762 Km for branches of Vadi & Thebi, Erection
of butterfly, scour & Air Valve of various diameter and
associated civil work including supply of all
consumable material @ Babra & Bagasara (Gujarat)
5PASCHIM GUJARAT
VIJ COMPANY LTD
Nana Mava main Road,
Laxminagar, Rajkot -
360 004
Main Contractor :
Parijat Solar Energy
LLP
Design, Survey, Supply, installation, testing,
commissioning ,Operation &maintenance for 25
years from Commercial Operation date (COD) of
grid connected substation level Solar power plant ,
erection and maintenance of its 11 KV Line to
evacuate power to the substation with Remote
Monitoring System (RMS) as per the PM - KUSUM
Scheme at Amblash A.C. Capacity 3.00 MW &
Installed D.C. 3.703 MW
6PASCHIM GUJARAT
VIJ COMPANY LTD
Nana Mava main Road,
Laxminagar, Rajkot -
360 004
Main Contractor :
Parijat Solar Energy
LLP
Design, Survey, Supply, installation, testing,
commissioning ,Operation &maintenance for 25
years from Commercial Operation date (COD) of
grid connected substation level Solar power plant ,
erection and maintenance of its 11 KV Line to
evacuate power to the substation with Remote
Monitoring System (RMS) as per the PM - KUSUM
Scheme at Gorakhmadhi A.C. Capacity 2.50 MW
& Installed D.C. 3.352 MW
7PASCHIM GUJARAT
VIJ COMPANY LTD
Nana Mava main Road,
Laxminagar, Rajkot -
360 004
Main Contractor : Parijat
Solar Energy LLP
Design, Survey, Supply, installation, testing,
commissioning ,Operation &maintenance for 25
years from Commercial Operation date (COD) of
grid connected substation level Solar power plant ,
erection and maintenance of its 11 KV Line to
evacuate power to the substation with Remote
Monitoring System (RMS) as per the PM - KUSUM
Scheme at Prashnawada A.C. Capacity 2.50 MW
& Installed D.C. 3.23 MW
8Adani Total Gas LimitedLaying of Under Ground Carbon Steel Pipeline
3LPE Coated of Approx. 10.5 KM in size NB
8"including supply of all consumable material for
connectivity to various CNG/ RO/DRS stations and
allied servics at Tirupur.
9Narmada Valley
Development Authority
(NVDA - M.P.)
Main Contractor :
Kalpataru Projects
International Ltd.
External Guniting works of various dia. 300mm
to 2100mm MS Pipes for “Jhabua Water Pipelines
Project” (MJIP) at Bagh Yard Dist. Dhar (MP).
10M/s. IHB Pvt. Ltd. (JV of
Indian Oil - HPCL &
BPCL)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Laying of OD 20” dia. (155 KM Approx.) Cross
Country LPG Pipeline from IOCL Dumad to MP
Border under Kandla – Gorakhpur LPG Pipeline
Project (Group-7)
11ADANI INFRA (INDIA)
LIMITED
Receipt, Unloading, Handling & Transportation,
Site Fabrication, Erection / Laying, Site Coating &
Painting, Site Testing, Commi. & Handover of Raw
Water Intake MS pipe 1350mm & 1300mm ID & its
associated items, Civil, Structural Steel Works &
Crossing of Intake Water Pipeline Works for
approx.. 30 KM Length from Godda Plant Side for
2 X 800 MW Ultra Supercritical Coal Based Thermal
Power Project Village Motia, Dist. Godda, State
Jharkhand.
12Narmada Water
Resources, Water
Supply and Kalpsar
Department
(NWRWS&KD - Gujarat)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Sauni Yojna - Phase: II, Link - 4, Package - 4:Crop
compensation, Unloading, Excavation, laying,
jointing, testing, backfilling ,disposal of surplus earth
& commissioning of MS Pipeline 3000mm dia (ID) at
Ch.0.00 Km near Ankadiya sub Headwork to Ch.
15.340 Km Near Khambhala Village (Total Length
– 30.68 Km), Erection of butterfly, scour & Air valves
of various diameter and associated civil works
including supply of all consumable materials @ Ghela
Somnath (Gujarat).
13HPCL Rajasthan Refinery
Ltd. (HRRL - Rajasthan)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Unloading, Excavation, laying, jointing,
testing, backfilling, disposal of surplus earth
& commissioning of Raw Water MS Pipeline
1300mm dia (ID) 18.411 Km From (PH-I) Bagundi
to Refinery @ HPCL Rajasthan Refinery Ltd.
Village – Pachpadra Dist. Barmer Rajasthan.
14Narmada Water
Resources, Water Supply
and Kalpsar Department
(NWRWS&KD - Gujarat)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Sauni Yojna - Phase: II, Link - 2, Package - 5: Crop
compensation, Unloading, Excavation, laying,
jointing, testing, backfilling ,disposal of surplus earth
& commissioning of MS Pipeline of 3000mm dia.
(ID) for Length of MS Twin Pipeline 14.910 Km
(Total Length – 29.820 Km) from Kalubhar at Ch.
27.711 Km to MPS – 1 near Village Vikaliya at Ch.
42.621 Km with all allied works etc.Erection of
butterfly, scour & Air valves of various diameter and
associated civil works including supply of all
consumable materials
15
Narmada Water
Resources, Water Supply
and Kalpsar Department
(NWRWS&KD - Gujarat)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Sauni Yojna - Phase: II, Link - 3, Package - 6:
Service for Cop Compensation, unloading,
Excavation, Laying, Jointing, Backfilling, Disposal of
surplus earth of MS Pipeline at Ch. 66.295 Km near
Machhu – Ireservoir & supplying and laying MS
Pipeline of 3000mm dia (ID) from Ch. 66.29 Km
(Machhu – I) to Ch. 97.29 Km (Aji – I) (31.00 Km
length) including gravity feeder pipeline (14.01 Km)
and lift feeder pipeline (9.28 Km) with feeder pumping
station near village Mesvada with all allied works etc.
16Ms/. GAIL (Odisha).
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
GAS Pipeline Installation & its associated work of
30” (762 mm) X 12.5 mm thickness, 14.8 mm
thickness and 18.5 mm thickness, API5L X-70,
Line Pipes 3 Layer PE Double random PSL–2
coating 11.5 to 12.5 Mtrs Pipeline Laying works
along with scope matrix for pipeline civil works &
mechanical works of Approx. 48 Km from Ch.296
Km to 344 Km for BOKARO – ANGUL Pipeline
Section of JHBDPL Phase-II (Section – IV) of M/s.
GAIL.
17Indore Water Supply
Project (M.P.)
Main Contractor :
RAMKY
INFRASTRUCTURE
LIMITED
Providing & applying 30mm thick 1:3 cement mortar
coating outside face & 20mm thick 1:2 cement mortar
on inside face of various dia MS Pipes 1900mm to
1100mm (ID) at Indore (MP).
18Narmada Valley
Development Authority
(NVDA - M.P.)
Main Contractor :
Shapoorji Pallonji and
Co. Pvt. Ltd.
Supply and External Guniting works of various dia
MS Pipes 1500mm to 700mm (ID) for for WATNVDC Chhipaner Project at Khategaon - Dewas
(MP).
19Narmada Water
Resources, Water Supply
and Kalpsar Department
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
SAUNI YOJNA : Link 3, Package 4: Crop
compensation, Unloading, Excavation, laying,
jointing, testing, backfilling ,disposal of surplus earth
& commissioning of MS Pipeline 3000mm dia (ID) at
Ch. 66.29 Km to Ch.97.29
(Total Length – 31.00 Km), Erection of butterfly,
scour & Air valves of various diameter and associated
civil works including supply of all consumable
materials
20Narmada Water
Resources, Water Supply
and Kalpsar Department
(NWRWS&KD - Gujarat)
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
SAUNI YOJNA: Link 4, Package 2:
Crop compensation, Unloading, Excavation, laying,
jointing, testing, backfilling, disposal of surplus earth
& commissioning of MS Pipeline 3000mm dia. (lD)
at Chainage 18.317 km from near Nagadaka
village Pumping Station to Chainage 37.50 km
near Goma Reservoir (19.183 km length), with all
allied works etc. at. Paliyad (Gujarat).
21Narmada Valley
Development Authority
(NVDA - M.P.)
Main Contractor :
NAVAYUGA ENGG.
COMPANY LTD.
External Guniting works of MS Pipes with automatic
brush coating machine for Narmada Malwa Gambir
Link Project in Indor (MP).
22Narmada Valley
Development Authority
(NVDA - M.P.)
Main Constrtor
:NAVAYUGA ENGG.
COMPANY LTD.
Transportation, unloading, Excavation, Laying,
Jointing, UT, Backfilling, disposal of surplus earth &
commissioning of various dia MS Pipeline 2000mm
(ID) to 700mm (ID) (Total Length – 30.83 Km) works
of LBC for Narmada Malwa Gambir Link Project in
Indore (MP).
23Narmada Valley
Development Authority
(NVDA - M.P.)
Main Contractor :
NAVAYUGA ENGG.
COMPANY LTD.
Transportation, unloading, Excavation, laying,
jointing, UT, backfilling, disposal of surplus earth &
commissioning of various dia MS Pipeline 2500mm
(ID) to 2200mm (ID) works of RBC (0 to 21.898 km)
works of RBC (0 to 21.898 km) for Narmada Malwa
Gambhir Link Project in MP.
24Public Health Engineering
Department (PHEDRajasthan)
Main Contractor : SPML
Infra. Ltd.
Internal Cement Mortar Lining & External Guniting
work of MS Pipeline for Narmada Canal Based ER
Transmission Main Project at Sanchor (Rajasthan).
25Indcon Projects &
Equipment Ltd.
Construction of VFD Building, HTDG Panel Building
etc. & Civil jobs at Vadinar (Jamnagar) pump station.
26Public Health Engineering
Department (PHED -
Rajasthan)
Main Contractor : SPML
Infra. Ltd.
Excavation, Transportation, Laying, Jointing, Testing,
Backfilling, Disposal of Surplus Earth &
Commissioning of MS pipeline 1200mm to 900mm
(ID) (Total Length – 59.352 Km), Erection of
Butterfly, Scour & Air Valves of various diameter and
associated civil works at Jalore (Rajasthan)
27SURAT MUNINCIPAL
CORPORATION
Construction of RCC Elevated Service Reservoir
(ESR-SE-18) of 21 lacs liters capacity with 24 mt.
Staging height at T.P. 58 (Bamroli), FP-no. R16 for
W/s Network of New South Zone & New South East
Zone area of Surat under JnNURM Scheme Surat.
28GIDC - Bharuch
Main Contractor :KUNAL
STRUCTURE (I)
PVT.LTD.
Construction of compundwall (pile foundation) at SEZ
connection corridor (9.50 km) SEZ at Dahej
(Bharuch).
29National Highway
Devlopment Project
(NHDP - Gujarat)
Main Contractor :
Backbone Enterprise
Ltd.
Construction of Culverts, Minor bridges, Major
Bridges, From km 63.800 to km 74.800 at works- Four
laning of Jetpur-Somnath Section of NH -8D.
30L&T India Ltd.
Main Contractor :
Kalathiya Engineering &
Construction Ltd
Construction of Toll Plaza Buildings, Tunnels, and
PQC at Rajkot Jamnagar Vadinar Road Project.
31Public Health Engineering
Department (PHED -
Rajasthan)
Main Contractor : SPML
Infra. Ltd.
Lowering, Laying & jointing of MS pipe with Cement
mortar lining &guniting of MS Pipe line of 1548 mm,
1241 mm, 1138 mm, 1038 mm, 933 mm, 833 mm od
at Pokaran (Balotra) Rajasthan.
32Suzlon Infa. Ltd. Wind Mill Foundation at Gujarat & M. P.
33Suzlon Infa. Ltd. Wind Mill Foundation at Chhachhi & Chopadava
Kutch (Gujarat) (43 No. Foundation).
34Public Health Engineering
Department (PHED -
Rajasthan)
Main Contractor : SPML
Infra. Ltd.
Lowering, Laying & jointing of MS pipe with Cement
mortar lining & guniting of MS Pipe line of 1528 mm
OD at Pokaran Rajasthan 36 Km.
Sr.Client’s NameDescription of the Work
1Water Resources
Department
Government of
Jharkhand.
SECC - RADHE JV
Kaimbo Megalift Irrigation Scheme on
Turn Key basis with 10 (Ten) years
Operation, Maintenance and
Management (OMM) (complete job).
2Water Resources
Department
Government of Odisha.
Chief Construction
Engineer
Anandapur Barrage
Project, Salapada -
Odisha
Construction of Distribution system for
3499.70 Ha. of CCA including Command
Area Development (CAD) of Salandi Left
Main Canal from RD 30.547 km to 40.927
km through Under Ground Pipe Line
Irrigation system (Gravity Flow) of
Anandapur Barrage Project in Balasore
District of Odisha on EPC-Turn Key Basis
including operation and maintenance of
the commissioned project.
3Water Resources
Department
Government of
Jharkhand.
RADHE - SECC JV
Residual work of Bhairwa Reservoir
Scheme on Turn Key basis with 05 (Five)
years Operation, Maintenance and
Management (OMM) (complete job)
4Water Resources
Department
Government of
Jharkhand
Canal Distribution System of OL-58 Ex.
117.95 Km of CLMC Ex. Chandil Dam
through Piped Irrigation network under
gravity.
5Water Resources
Department
Government of
Jharkhand
Canal Distribution System of OR-54/56
Ex. 115.90 Km of CLMC Ex. Chandil Dam
through Piped Irrigation network under
gravity.
6Water Resources
Department
Government of
Jharkhand
Construction of Sub Minor & W/C of OR47 through UGPL, Ex. Km 100.500 of
CLMC at Dhalbhumgarh, Dist.
Jamshedpur.
7Odisha Construction
Corporation Limited
(OCCL)Government of
Odisha
Construction of Distribution System for
2526 Ha. of CCA including Command
Area Development (CAD) in 09 Nos. of
Minor Irrigation Projects through Under
Ground Pipeline Irrigation System
(Gravity Flow) in Ganjam, Kandhamal,
Nayagarh & Sambalpur Districts of
Odisha on EPC - Turn Key Basis
including Operation & Maintenance of
complete commissioned project for 05
Years (Package - IV)
8Water Resources
Department
Government of Gujarat
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Crop compensation, unloading,
Excavation, laying, jointing, testing,
backfilling, disposal of surplus earth &
commissioning work of pipeline
Irrigation Project for filling Saran
Reservoir and direct irrigation from
KBC Ch. 105 Km. at Rapar (Kutch)
(Total MS Pipe Lengh - 72,890 Mtr
9Water Resources
Department
Government of Gujarat
Main Contractor : JSIW
INFRASTRUCTURE
PVT. LTD.
Crop compensation, unloading,
Excavation, laying, jointing, testing,
backfilling, disposal of surplus earth &
commissioning work of Lift Irrigation MS
pipeline project for transmission of water
from N.M.C. Chainage 354.819 Km at
Mansa Village (near Kasara Village) to
Dantiwada reservoir through Balaram
River MS Pipeline (Total MS Pipe
Length - 1,37,550 Mtr)
10Adani Total Gas LimitedLaying of Under Ground Carbon Steel
Pipeline 3LPE Coated of Approx. 7.00
KM in size NB 8"including supply of all
consumable material for connectivity to
various CNG/ RO/DRS stations and allied
servics at Tirupur.
11Gujarat Gas LimitedLaying testing and commissioning of
Steel Pipeline Project for COCO
Mother CNG Station Connectivity at
Botad in Bhavnagar GA
12National Health Mission
Division, Indore (M.P.)
Construction of 12 Nos. Sub Health
Centre Karaniya (N), Khariyamaal,
Mandwabhatti, Mordar, Nihali, Nimsethi,
Palona, Pipri, Rajpura, Rehatfal, Tinsiya,
Mundiya (Block Jhirniya) with CHO
Residence at District Khargone M.P
Group–3
READY TO BUILD WITH CONFIDENCE?

Partner With Radhe Construction For
Reliable Infrastructure Solutions

From water infrastructure and industrial projects to large-scale civil construction,
we deliver quality-driven engineering solutions with safety, precision, and timely execution at every stage.